SELECTIONS & LEAD TIME

When working with a contractor or manufacturer you may hear the term “lead time”. Essentially, lead time is the total time required to facilitate a selection, order, manufacture, prepare, transport, and receive materials on the jobsite.

When ordering material at Lindahl Construction we always want to ensure that the correct material is or­ dered and at the correct prices. You may think ordering material for construction to be a quick and easy task, but there are multiple processes happening behind the scenes that are critical to the schedule of a jobsite.

Below you will find a general list of processes that go into proper ordering and installation of a product or application. This can be used as a general template for any application in construction.

Action Item Typical Duration
1 Homeowner visits showrooms, evaluates options, etc. to make a selection by deadlines given on Schedule of Design Selections and Comprehensive Selection Spreadsheet. Homeowner Dependant
2 Lindahl Construction communicates selections to vendor/subcontractor then vets proposal from vendor/sub once received. 5 – 10 days
3 Once proposals are vetted, Lindahl Constructionreviews pricing with homeowner and selections are finalized or changed. If changed, repeat steps 1 and 2. 3 – 5 days
4 Homeowner finalizes selection with signature approval. 1 – 2 days
5 Deposit invoice is approved and paid by Lindahl Construction to vendor/sub. 3 – 7 days
6 Upon receipt of deposit check, vendor/sub places order for material. 2 – 5 days
7 Await arrival of material per lead time designated for that specific material Selection Dependant (ie. tile could
take 2-7 weeks)
8 Subcontractor schedules then begins executing installation of material. 1-10 days (depentant on Sub availability)
Possible duration from homeowner selection to installation on jobsite: Up to 88 days
Selections needed during Architectural Design Phase (before construction):
Selection Date Needed
Windows & exterior/interior window finishes (paint/stain/color)
Front entry door design
Exterior doors (species, paint/stain)
Exterior door hardware
Flooring material type in all locations (wood, tile, stone, carpet)
Plumbing fixtures
Electrical design with floor plug locations
Driveway/motor court layout & pavers locations
Exterior trim paint & stain (soffit, cornice, corbels, siding, shutters, vents)
Roof material
Roofing selections (d o rm er , finials)
Interior door design & material
Appliances
Interior beams (species, locations, box vs. solid, stained vs. painted)
Fireplace (hearth & chimney cap design & materials)
Fireplace (hearth & chimney cap design & materials)
Motorized shades locations & requirements
Garage door design & finish
Pool location and concept
Selections needed before beginning Frame Stage:
Selection Date Needed
Sconce placements
Blocking locations (bath accessories, upper cabinets, draperies, etc.)
Cabinet design & layout (for electrical placements)
Stair treads & risers (material/profile)
Lighting plan & light fixtures
Exterior gas & electric sconces
Chandelier lifts (need chandelier weight for each fixture)
Interior & exterior rail design/photos
Drywall treatment
Mirrors & shower doors
Pool design
Elevator selection
Security system
Audio/Video selections
Lighting controls, dimmers
Home theatre system
Mosquito control system
Selections needed before beginning Drywall:
Selection Date Needed
Cabinet material (species, paint/stain)
Trim moulding profiles (baseboard, crown)
Interior paint selections for each room/space (walls, trim, ceiling)
Wallpaper/faux paint /plaster selections and locations
Driveway pavers selection, if any
Pool tile, deck & coping material
Pool plaster finish & color
Wood floor selection
Carpet selection
Tile selections (including grout color & layout design/pattern) Countertop & slab selections
Interior door hardware
Cabinet hardware
Bath accessories
Custom glass, if any